Progress on building 1/4 inch scale narrow gauge. My On3 layout is based on eastern logging and common carrier prototypes. Also working on an On2 module based on the WW&F and On30 module based on the Gilpin Tram
Sunday, November 2, 2014
Getting closer.
Had just a little time this week to work on the hobby. Work has been very busy. Did get the Silver City shay running on DC. A BIG step in the right direction. Maybe will get her done by the end of the year....
Sunday, October 26, 2014
Many years waiting.....
This week I managed to pull out my CHB models log carriage and assembled it. Back in the mid 80's I saved up a little money mowing lawns, etc. to get the edger and log carriage kit. Couldn't afford much and I knew that I would want a band mill rather than the circle mill. Well, I finally got the kit out and assembled it. Magnificent castings. Charles Brommer was an EXCELLENT pattern maker and caster. The knees on the carriage move back and forth as do the dog settings. Sometime in the future, I will partially cut a log and put it on the carriage and the carriage in the sawmill. Another time.......
Also managed to paint a slew of Chivers Finelines Gilpin style On30 trucks for the new Arroyo Tram. Wasn't too fun air brushing the sets but needed to get done. Also started painting two completed Grandt Line Gilpin Tram cars, one Chiver's side dump gon and a On3 Foothills Models gon that I assembled a while back. Oh, yeah, finally touched up the lettering on that Flying Zoo Climax. Just need to add windows and an engineer!
Also managed to paint a slew of Chivers Finelines Gilpin style On30 trucks for the new Arroyo Tram. Wasn't too fun air brushing the sets but needed to get done. Also started painting two completed Grandt Line Gilpin Tram cars, one Chiver's side dump gon and a On3 Foothills Models gon that I assembled a while back. Oh, yeah, finally touched up the lettering on that Flying Zoo Climax. Just need to add windows and an engineer!
Monday, October 13, 2014
Back to the Future?
Finally had some time this last weekend to pull out some models and get some work done. Recently, I developed an interest in getting some engines that I procured long ago, started. Getting tired of so many half completed projects maybe? Don't know. Worked on my Leetown Models Climax till I realized I was missing some parts. That happens when you keep models in pieces for more than 14 years!
I also realized that I had no business starting a new project when I had another one still uncompleted! My frustration with the shay project is considerable. All due to some poorly cast and prepared parts. Oh well, live and learn. Managed to get some backhead detail on my PSC Silver City shay. Some really, really crappy instructions had me going back to add parts that were on the engine but not discussed in the instructions. Geeze. What were they thinking at PSC back in the 80's? Maybe I shouldn't ask....
Progress was made. I couldn't believe that I would need to use a torch for this level of detail or maybe I should say, these TINY parts. However, the backhead and boiler are MAJOR heatsinks and I just couldn't get the solder to flow using the resistance soldering tools. When it comes to this stuff, trial by fire, sometimes literally. While I struggled with this and wasn't really sure that I was having that good a time, when I got this far, there was definitely a feeling on wonderful satisfaction! All in a good weekend. I guess the rain wasn't too bad after all. Hey, I even managed to get some real work, i.e. work, work, done! Someday this shay will get completed.....someday........
I also realized that I had no business starting a new project when I had another one still uncompleted! My frustration with the shay project is considerable. All due to some poorly cast and prepared parts. Oh well, live and learn. Managed to get some backhead detail on my PSC Silver City shay. Some really, really crappy instructions had me going back to add parts that were on the engine but not discussed in the instructions. Geeze. What were they thinking at PSC back in the 80's? Maybe I shouldn't ask....
Progress was made. I couldn't believe that I would need to use a torch for this level of detail or maybe I should say, these TINY parts. However, the backhead and boiler are MAJOR heatsinks and I just couldn't get the solder to flow using the resistance soldering tools. When it comes to this stuff, trial by fire, sometimes literally. While I struggled with this and wasn't really sure that I was having that good a time, when I got this far, there was definitely a feeling on wonderful satisfaction! All in a good weekend. I guess the rain wasn't too bad after all. Hey, I even managed to get some real work, i.e. work, work, done! Someday this shay will get completed.....someday........
Thursday, September 25, 2014
Remembering the 1st Op's Session on the Deer Creek and Laurel
Blast from the Past!
Remembering the 1st Op's Session on the Deer Creek and Laurel.
Clint, Mark and Wayland for attended the first Operations Session/Open house on November 15, 2009. It was great to finally meet Mark a Railroad-line, On30 forum contributor.
I think for the inaugural operations session things went well. Of course, I have a few minor changes to make for the next session. Here are some photos:
Here's clint bringing in the daily coal train to Collins


Here's Mark working the morning log train.
Remembering the 1st Op's Session on the Deer Creek and Laurel.
Clint, Mark and Wayland for attended the first Operations Session/Open house on November 15, 2009. It was great to finally meet Mark a Railroad-line, On30 forum contributor.
I think for the inaugural operations session things went well. Of course, I have a few minor changes to make for the next session. Here are some photos:
Here's clint bringing in the daily coal train to Collins

Here's Clint and Wayland working out the Southbound passernger/milk run and the northbound mixed out of Laurel.

Here's Mark working the morning log train.
Friday, July 25, 2014
More progress
Making more progress with the Arroyo Tram. Cleaned up and back to operations. Very fun for such a small layout!
Tuesday, July 22, 2014
A little scenery......
Managed to get some scenery down on the Arroyo Tram. Slow progress. While I'm a little driven to get more done, I'm finding myself more interested in building some cars, buildings, etc. Think I will try to get a little more base scenery profile done and then take a brake, build some cars or another shay........
Monday, July 21, 2014
Arroyo Tram Up and Running!
Over the weekend, I was able to install all the track and get the Arroyo Tram wired up. Trains are running on the layout. Had some issues with the layout not being level and thus turning my grades into 6% uphill rather than 3 and 4%. Once I got that fixed, things ran fine.
Also took my On3 shay truck apart, added washers to eliminate the "play" in the drive wheel. Re-assembled and while it certainly made a difference, it still did not eliminate the jam entirely.
So, I finally completely dissasembled the truck, all gears, etc. and FOUND THE PROBLEM!! The drive shaft for the gears was slightly bent, a few thousands off. It was one of the only parts that was assembled when I bought the kit and has cuased the greatest strain for me. New shaft material has been ordered and the shay awaits completion!
Also took my On3 shay truck apart, added washers to eliminate the "play" in the drive wheel. Re-assembled and while it certainly made a difference, it still did not eliminate the jam entirely.
So, I finally completely dissasembled the truck, all gears, etc. and FOUND THE PROBLEM!! The drive shaft for the gears was slightly bent, a few thousands off. It was one of the only parts that was assembled when I bought the kit and has cuased the greatest strain for me. New shaft material has been ordered and the shay awaits completion!
Subscribe to:
Posts (Atom)



