Thursday, March 8, 2018

Arroyo Tram Gets a Staging Track

This weekend I manged to complete the long awaited staging track for On30 Arroyo Tram module.
I originally built the extension a bit too short to accommodate  a run-around track, which made it less than ideal. Also, it had to propped up with something on one end, which made it impractical. So, I extended it 12-inches, and added foldable legs and wires to power the track.


Wow, does it make operations more enjoyable! The layout/module is now a layout and not a switching puzzle. Before, you had to really watch train length and were limited in moves by the two tail tracks. Now you can use all the length needed, which makes operation much more prototypical and more enjoyable, plus there is somewhere to come from and go to complete the operation session. I should have done this a long time ago. 


The removable staging area will now be used until the layout gets completed and I start Phase II which will have a model of the Gilpin's enginehouse. A "someday" project.

Also, work continues on the On2 WW&F Albion module with slow but continued progress on the Albion station. Till next time........


2 comments:

  1. that sand color and your tie colors are perfect! is that real sand or tile grout you are using?

    ReplyDelete
  2. Arrizona Rock and Mineral: 1203 CAJON SAND & GRAVEL
    Micro Engineering flextrack with hand painted ties and black wash

    ReplyDelete