I've been running trains again on the Arroyo Tram. A nice relaxing way to end the day. Operations run from 20-40 minutes. While I use computer generated switch lists on the DC&L and have used them on the Arroyo, I wanted something simpler for such a small layout. I didn't want to use the computer (I'm on that for work all day it seems) and I wanted something quick that I could just walk up to the layout and use on demand. So, I pulled out my old box of Micro Mark car cards and waybills. I re-read an old MR article by Malcom Farlow on using car cards for his San Juan Central, looked quickly at Tony Keoster's Operations book and sat down to come up with something.
What a quick way to come up with something! In less than an hour, I had the cards and waybills written and the boxes installed. Started operating. Quickly learned that I need more cards. I then used an Excel program written by a German narrow gauger that I found on line about 10-years ago to generate 4-sided waybills. Still works! I worked up some better waybills and off we go!
The system is working great. I can just walk up without any planning an start operating a train. I can walk away and come back when I want to. Easy, simple and quick, which is what I wanted for this particular layout. Operations have identified three things that I knew but didn't really want to be reminded of:
1. I need to build something to put the cards on! I always put the cards on the layout, on the scenery. Bad! I need to build something on the fascia to hold cards. On the to-do list, maybe you'll see it posted...NEXT YEAR!
2. I need to install a Tam Valley frog juicer. One single frog juicer hooked up to all my turnouts will work great since I only run one locomotive on each module at a time. I just need to do it as I'm getting stalls on the frogs. No, none of these loco's have stay alive's.
3. I have too many cars. I've known this. I just can't help building cars. If you've followed my blog for any period of time, you'll realize that what I really like about the hobby is building things. There are so many opportunities to scratch build or kitbash cool cars for this On30 layout! However, I need less than half to run the layout effectively. With less than 1/2 the cars, I still have plenty of switching, it looks better and I have enough sidings to handle traffic. With all my cars, well, everything is full and operations are, well, not that realistic. Heck, it's a small layout, what did I expect! Basically, it is an L-shaped layout with one 2 x 8 section and a 2 x 6 section.
What to do with all those cars...... and I'm building more. Oops! I'll have to find somewhere to store them, maybe make a drawer under the layout - you'll see that posted in.......2-years!
So, I'll get that Tam Valley frog juicer installed this weekend, get over 1/2 the cars off the layout and someday build that little sloped table to hold car cards but in the meantime, I'll be building more stuff and running the occasional train on the Arroyo Tram.
No comments:
Post a Comment