Sunday, October 9, 2016

Legs


The Albion module has fallen behind a bit due to a lack of legs. I had wanted to start laying track weeks ago. I had intended to bolt the two module sections together, place some saw horses under them and start on some much anticipated track work. However, the bolted joint ended up performing more like a hinge, so I decided that I'd better just build the legs first and figure out how to stabilize the whole thing.  Legs are now on one module and should be done on the second soon. Can't wait to not be cutting and fitting bench work! Track down soon! (Famous last words)

....


No comments:

Post a Comment