This weekend I finished up painting two Boulder Valley On30 4 wheel flat cars. I bought these a while back before they folded up shop. Thought they looked interesting. They were fun and fast to put together. Took me longer to paint them than to build them. I added a short strip of lead weight underneath the deck and body. They roll great. Nice little cars.
Progress on building 1/4 inch scale narrow gauge. My On3 layout is based on eastern logging and common carrier prototypes. Also working on an On2 module based on the WW&F and On30 module based on the Gilpin Tram
Monday, March 26, 2018
Thursday, March 8, 2018
Arroyo Tram Gets a Staging Track
This weekend I manged to complete the long awaited staging track for On30 Arroyo Tram module.
I originally built the extension a bit too short to accommodate a run-around track, which made it less than ideal. Also, it had to propped up with something on one end, which made it impractical. So, I extended it 12-inches, and added foldable legs and wires to power the track.
The removable staging area will now be used until the layout gets completed and I start Phase II which will have a model of the Gilpin's enginehouse. A "someday" project.
Also, work continues on the On2 WW&F Albion module with slow but continued progress on the Albion station. Till next time........
I originally built the extension a bit too short to accommodate a run-around track, which made it less than ideal. Also, it had to propped up with something on one end, which made it impractical. So, I extended it 12-inches, and added foldable legs and wires to power the track.
Wow, does it make operations more enjoyable! The layout/module is now a layout and not a switching puzzle. Before, you had to really watch train length and were limited in moves by the two tail tracks. Now you can use all the length needed, which makes operation much more prototypical and more enjoyable, plus there is somewhere to come from and go to complete the operation session. I should have done this a long time ago.
Also, work continues on the On2 WW&F Albion module with slow but continued progress on the Albion station. Till next time........
Subscribe to:
Posts (Atom)